|
Attack
of the Pod!
Here
are some of the latest pictures of the new pod arrangement on the
JS 9000. According to to Paul Burnham, head know-it-all from JS,
"This is the new cockpit control console. The photos show the
plug with some fittings sitting in place. All lines now run aft
and the pod incorporates the foot chock."
I
know that a lot of you have been wondering what's going on with
the boat, and Paul gives us a bit more update as well, "As
you know we have made a few upgrades/modifications/improvements
to the JS9000 including; new keel fin, additional ballast, new bulb,
new rudder blade, new tiller, new cockpit control console etc.
These
alterations were made in the longer term interest of the boat and
the owners and obviously required a number of new mouldings and
loads more work.
However,
the final result is an uncompromised race ready flyer that is likely
to set new standards in contemporary yacht design (and I didn't
even have to pay an advertising exec. for that lot!).
We
can also happily report that the hulls and decks are being constructed
at the rate of two each week. So at the moment we have a mini-stockpile
of boats while they are all fitted off with new keels etc. Although
the changes have taken longer than planned, all signs point to the
JS9000 becoing an unprecedented international success."
For more info of the status of the 9000, click on their banner here
on the front page or send a note to Paul, burnham@iinet.net.au
04/07/2003
|